The following work is scheduled over the next three weeks:
Toll Plaza
- East side (entering 14A): renovation of existing Toll Utility Building continues.
- Reconstruction of Toll Lanes 8-10 continues.
- During the weekend of 04/07/17, concrete pavement construction will be performed in Toll Lanes 8, 9 & 10. At the end of this weekend, Toll Lanes 8, 9 & 10 will be reopened. This work will be supported by Bayonne and the NJ State Police.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
- Widening construction on the ramps to and from the westbound and eastbound HCE is complete to the extent possible and the final alignment has been implemented. Asphalt resurfacing of the ramps will be performed in 2017.
- Local street level work at Garfield, Avenue C and JFK Boulevard bridges will resume in the Spring of 2017. This work will be supported by Jersey City and Bayonne Police as needed.
Avenue E / Proposed Roundabout
- New roadway construction on Avenue E near 53rd Street continues.
- Deep bridge foundation construction in dedicated work zones continues. This work will be supported by Bayonne Police as needed.
- New bridge pier construction in dedicated work zones continues.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
- Traffic was shifted onto the new Connector Bridge in a two-way temporary traffic pattern. Please CLICK HERE for graphic.
- Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited. Please CLICK HERE for shuttle bus pamphlet.
- During the weekend of 05/05/17 and 05/12/17, new bridge steel installation operations will be performed over NJ Transit’s Hudson-Bergen Light Rail and Conrail’s Industrial Track. During these periods, NJ Transit Light Rail service between 34th Street Station in Bayonne and Danforth Avenue Station in Jersey City will be maintained via NJ Transit bus service.
Route 440 and Pulaski Street Intersection / Jughandle
- Ramp roadway construction continues.
- Median barrier construction on Route 440 continues.
- Ramp structure construction to southbound Route 440 continues.
- During the week of 04/24/17, northbound Route 440 traffic will be shifted left (two northbound lanes adjacent to median) and a work zone will be established on the right.
Ramp Area East of Route 440
- New ramp construction continues.
- Retaining wall construction continues.
- Bridge deck construction on the bridge structure over Pulaski Street continues.
- Roadway construction continues.
###




General Manager Kenneth Rosado and the staff at Kitchen Step go the distance when it comes to customer service, which is evident when the 60-seat eatery fills up during weekend brunch with customers clamoring for dishes like the Nutella Swirl Pancakes and Truffle Eggs Benedict with Smoked Salmon.
The City of Hoboken is creating a housing waiting list for all future affordable rental units regulated by the City. Members of the public are invited to submit a preliminary application by visiting
Move-in Condition-Law Office-excellent for Law or Medical building, one block from new Hospital on Broadway.

Previously, Joseph won accolades for another one of his movies, “The American Dream” a documentary on immigrants, which was awarded second prize in the 2015 C-SPAN StudentCam competition and aired on national television. A longer version of that film screened at Loews Historic Theater, and at the Gala Opening Nite of the 2015 Golden Door International Film Festival. Prior to that, Joseph produced “The Colors of Timothy,” a comedic mockumentary which garnered a nomination for Best Regional Short Film, and a personal scholarship for Joseph –all from the Golden Door International Film Festival. More recently, Mr. Sexton was the recipient of the James Gandolfini Filmmakers of Tomorrow Award.